Playback serverIf a title won’t play, switch servers.
Season 7 · Episode 3

0.044mJanuary 11, 2000
The challenge of linking Britain and France with a tunnel under the English Channel was both monumental and delicate. It took 18 months just to design and build the 28 foot diameter TBMs, and nearly a year to assemble and position them underground. Modern Marvels takes you through the entire process from start to finish.