Playback serverIf a title won’t play, switch servers.
Season 1 · Episode 10
0.030mMarch 11, 2010
Bryan's done with the downstairs and now he can start work on the final part of the house the master bedroom and ensuite. Once a huge fireplace is installed, Bryan and Adam get work tiling the bedroom wall. While Sarah and Rebecca try and sneak a paint colour past Bryan.