Playback serverIf a title won’t play, switch servers.
Season 45 · Episode 3
0.027mOctober 12, 2023
Accessible features integrated into the design begin at construction. A new mechanical room connects to the old via a block wall tunnel, HVAC ducting is buried underground, and after learning about residential elevators, framing begins for one.