Playback serverIf a title won’t play, switch servers.
Season 36 · Episode 2

0.0October 11, 2014
A fix for a major problem: exterior walls that are bowing outward. Two weeks of work in the basement, meanwhile, has lowered the floor by several inches; the radiant heat-insulation system is installed; and it's shown how the roof is under-structured. In other events, Norm revisits a Charlestown townhouse featured on the show 14 years ago.