Playback serverIf a title won’t play, switch servers.
Season 1 · Episode 26
0.050mJuly 29, 2004
There's an update on the outside ground work, the conservatory flooring is laid, the garden deck base is built, and the pond liner is installed. Tips on bathroom tile grouting, bath fitments, using power saws, and fitting a shower unit.